GUIA RAPIDA PLASMASTATIC MINI

QUICK GUIDE TO USING THE PLASMASTATIC MINI

MINI SIZE, BIG RESULTS

OPERATING CONDITIONS

  • TEMPERATURE: BELOW 68°F (20°C)
  • HUMIDITY: BELOW 40%
  • VOLTAGE: 100-230VAC / 5 AMPS
MAKE SURE THE SIFT IS COMPLETELY DRY

STEP 1 – PREPARATION

  • Place the unit on a stable surface.
  • Ensure the door is fully closed.
  • Confirm the interior is clean and dry.

STEP 2 – LOAD MATERIAL

  • Place sift into the upper vibrating basket.
  • Do not overload the basket.
  • Distribute material evenly.

STEP 3 – ADJUST VIBRATION

The rear potentiometer controls vibration intensity.

• Turn clockwise → increases vibration.

• Turn counterclockwise → decreases vibration.

STEP 4 – POWER ON

  • Press the Power Button.
  • The system energizes plates at 9000 volts.

STEP 5 – REPROCESSING

  • Allow to operate for 5 minutes.
  • Collect and reintroduce material.
NOTE: Each additional pass increases purity.

VIDEOS

BASIC STARTUP

ADVANCED SETTINGS